Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | HC |
Model Number : | sandwich |
Certification : | CE |
Payment Terms : | 30% deposit by TT in advance, the balance to be paid before delivery. |
Supply Ability : | 20Set/Month |
Delivery Time : | 60days after receive agreed deposit. |
High quality double metal sandwich panel roll forming machine production line
Glue Pump Discharge
This machine adopts K-9 Type Glue Metering Pump, low rpm, high precision. The glue quantity is adjustable between 0.1-0.2kg/min and average usage amount is 0.25-0.4kg/㎡.
Product Thickness
The thickness of sandwich panel is 50-250mm. The machine can process various of different thickness and scale by adjusting the distance between the upper layer and lower layer, the cutting tool holder up and down and the feeding device.
Installation dimension | 28000 * 2500 * 2500 mm |
Total Power | 25 kw |
Voltage | 380 V 50 HZ 3 phase |
How to cleaning the glue pump
Remove the sprocket and the six screws on both sides, demount the
gears and bearings from the inside, and put them and the three
plates in a water solution of xylene or lacquer thinner and soak it
for a while, then clean it.
Flatten the joints of the three boards with butter, install the
gears and bearings in order, and tighten the screws.
Attention: The normal operation of the equipment also requires your
careful maintenance!
The material of the core | foam or rock woll |
Motor | 25 KW |
Production Speed | 0 - 5 m/min |
Annual output | 6000000 m2 |
Maintenance after shutdown the glue
1.If you start up the machine every day, the pump station should be
specially treated after shutdown and it will work normally the next
day.
2.If the machine is shut down between 16-48 hours, all the small
holes in the hose should be plugged with a pin and you can continue
to work after pulling it out.
3.If the machine is shut down for 48 hours, the dripping hose
should be removed and put away, the suction hose should be put back
the glue barrel and insert into the glue liquid.
4.If the machine is shut down for a long period of time, you should
start the glue pump once every three to five days, and cycle it for
five to ten minutes to ensure that no air enters or you can remove
where the glue is passes through, clean it and store it. This
method is taught by professionals, please learn it and remember it.
![]() |